Daily 9:00–19:00Almaty, 17 Si Sinkhai St
+7 777 940 52 40 Book a measurement

Blog · 9 min read

How to glaze
a balcony

Sergey Ilyenko, window installation master

Author: Sergey IlyenkoWindow installation master

Published
Updated

A practical guide to cold and warm glazing, frame and glass choices, and the checks to make before you order a balcony window unit in Almaty.

OKNA PLAST builds balcony window units in its own workshop in Almaty and installs them with its own crews, so you deal with the maker rather than a middleman. Cold aluminium and warm PVC systems solve different problems, and the right choice depends on your parapet, slab and how you plan to use the balcony.

Cold and warm glazing and what separates them

Two options solve different problems: cold aluminium suits an unheated balcony, warm PVC turns the space into a heated extension of the room. The gap sits in the frame, the chambers and the glass assembly.

How cold and warm balcony glazing differ in profile and glass

Cold systems use aluminium frames with a single-chamber unit; warm systems use multi-chamber PVC profiles and a double-chamber 32 mm glass unit. Aluminium conducts heat, so those frames stay slim and light — which is why they suit a balcony nobody heats. Warmer systems close the loop with several air chambers, two sealing contours and a wide spacer that slows heat loss toward the room. We fit both types and meet the same mistake on site: a thermally rated profile installed where no heating source exists. The insulation then works against nothing. If the balcony stays unheated all year, the thicker frame gives no saving — it pays off only where the space is warmed.

Which profile series suit a warm balcony

Warm-balcony profile series by chambers and width
Profile seriesChambersMounting widthGlass unit
Deceuninck Favorit571 mmdouble-chamber
Deceuninck Favorit Space676 mmdouble-chamber
KBE 76676 mmdouble-chamber
Rehau Geneomulti—up to 52 mm
Veka Softline 70—70 mmdouble-chamber

Loggia glazing options and how a balcony differs

A loggia is built into the building and has three walls, while an open one is carried on a slab with a parapet. That structural difference decides which glazing variants fit and where the load goes.

Loggia glazing options for a built-in space

On a loggia the side walls are load-bearing, so variants run from full-height warm PVC to panoramic schemes with a low sill. Measure the reveal depth first: a 70 mm profile needs at least 90 mm of clear depth for a two-chamber glass unit, and a 76 mm system with a 52 mm unit needs closer to 110 mm. Panoramic layouts with a sill under 500 mm gain light but force tempered glass below the 900 mm mark, adding weight to the slab edge. The built-in sides anchor wide sashes solidly, yet they cap how far the space can extend outward. Check the reveal depth before choosing a panoramic scheme, or the frame will sit proud and the sill detail will fail.

What a balcony window unit adds to the opening

A matched window-and-door set fills the whole opening, so the frame, sashes and threshold are engineered to work together. The leaf usually runs 700–900 mm wide, and the glazed section above or beside it shares one mullion line, which keeps the profile straight and the hardware aligned; the threshold sits low enough to step over but high enough to drain. One block also means a single anchor line around the perimeter instead of two fixings meeting at a corner. We fit these sets with reinforced hinges and hardware matched to the leaf weight. A ready window-and-door set seals better than a separately bought pair — fewer joints mean less draught at the corners, so specify the whole thing as one item.

What to consider when glazing a balcony in Almaty

Heat, grit and a 9-point seismic rating shape both the glazing package and the way the frame is fixed — these are the first things worth weighing before you order.

Heat, dust and noise and how they shape the glass unit

A two-chamber 32 mm assembly handles summer heat and street dirt best, and on a noisy avenue a profile rated up to 46-48 dB cuts traffic sound noticeably. KBE 76 reaches 46 dB across six chambers, while Salamander bluEvolution with 3.3 mm walls goes to 48 dB — the difference is audible on a boulevard-facing balcony. Fine particles settle on the seals faster than on the panes, so the number of rubber contours matters more than glass thickness for anyone who rarely washes the balcony. This is what to consider when glazing a balcony: the seals do the quiet work. A second and third contour keep that coating out of the rebate, where it grinds the gasket and lets draughts in over a couple of seasons.

Seismic zone 9 and why installation follows GOST

We install to GOST with the 9-point ground rating in mind, so anchors and fixings are sized for movement rather than a static wall. Every opening in a panel building sits in a slab that flexes, and a structure bolted rigid to it transfers the whole load into the joints. Our crews leave a controlled gap, pack it with elastic foam and set anchors at the spacing the standard requires for tremor-prone zones — the assembly moves with the building instead of fighting it. A rigid fixing with no allowance for movement cracks along the seams at the first real shake — that allowance matters more than it looks on installation day. The three-layer joint design and its airtightness requirements are set out in GOST 30971.

What the surveyor checks on your parapet and slab

Before any calculation, the surveyor inspects the parapet, the balcony slab and whether an extension is realistic at all. The base decides whether a warm frame can stand on it safely.

Parapet and slab condition before any glazing

  • Parapet: check for cracks, loose render and rust, since a warm PVC frame loads the base more than a cold one.
  • Slab: check level and soft spots near the outer edge, where water and frost damage most.
  • Anchors: confirm the wall takes the fixing depth, as aerated block and hollow brick hold differently.
  • Drainage: ensure the sill drains away from the wall so meltwater does not run back under the unit.
  • Clearance: measure the opening first, since a 70 mm system leaves less glass than a 60 mm one.

When a balcony extension is possible and when it is not

Extending a balcony outward is only realistic on a load-bearing base with the right permits, and on most built-in loggias it is ruled out entirely. The extension moves the frame line beyond the parapet, so the new floor carries its own weight plus snow and furniture, and that load travels further from the bearing wall. On older structures the margin is often gone, and the surveyor sees it from the edge and the anchor test. A parapet that was never designed for a frame above it usually needs a metal tie-in first. The surveyor also checks how the new floor line meets the existing wall: the further the frame moves out, the more the load shifts to the outer edge, and the tie-in has to carry that shift before any profile is ordered.

What you can do yourself and when to call installers

Part of the work is genuinely manageable on your own, but surveying, fixings and approval in a panel building are the points where a mistake costs more than the saving.

Step by step and where DIY stops

  • You can do: clear the balcony and remove old glazing before the crew arrives.
  • You can do: choose the profile and glass unit with a manager.
  • Leave to crew: anchor depth and seismic movement allowance.
  • Leave to crew: perimeter sealing and sill drainage outward.
  • Leave to crew: slope, reveal finishing and parapet drip edge.

Approval in a panel building and the risk of skipping it

Fitting a balcony in a panel building usually needs approval from the building management, and skipping it can mean a demand to restore the facade. The paperwork is rarely about the glazing itself — most objections concern the single facade appearance, so the profile type and colour are worth settling before the order rather than after installation. In a typical panel block the slab edge carries the load, so anchor depth and reveal depth have to match the house requirements. Sort the approval first: on a panel facade, a colour change or a different sash split is easier to agree on paper than to rebuild on a finished wall.

Turnkey installation, timing and warranty

Turnkey work means the window sill, drip cap and reveal finishing go in on the same day as the frame, and the whole job from contract to installation stays within two weeks.

What turnkey installation includes and how long it takes

Turnkey means the window sill, drip cap and reveal finishing go in on the same day as the frame, and from contract to installation takes no more than two weeks. Our own crew brings the assembled unit from our workshop, sets it to GOST with allowance for 9-point seismic activity, and mounts the board and reveals — no separate finisher afterwards. The engineer prices the board, reveals, the metal cap, dismantling and mounting before you sign, and the deadline is written into the same document as the price. That is why we check the parapet and slab first: a weak slab or a cracked parapet changes the fixing plan and can move the dates.

Warranty and care for seals and hardware

We give a 10-year warranty on windows and 5 years on sills, reveals and drip caps, and our service covers adjustment plus seal, handle and glass unit replacement, and 13 services in all. Seals and hardware carry their own warranty, so a stiff handle or a draught at the sash edge is a service call, not a reason to change the unit. The EPDM seal wears faster than the hardware: dust from the steppe and summer heat dry it out, and a sash that no longer pulls tight lets in noise and cold air. Keep the drain holes clear and wipe the seal with a silicone compound, not an abrasive — that keeps the gasket supple and the sash closing softly.

What to check before signing the order for the structure

The right solution comes down to matching frame and glass to how the balcony is used, then getting fixing and sealing right on site.

  • Cold aluminium for an unheated balcony: a light frame with single or double glass keeps rain, dust and wind out without claiming to heat the space.
  • Warm PVC only in a heated room: five or six chambers and a two-chamber unit pay off where a radiator runs.
  • Fit the profile to the opening: chamber count and unit thickness follow the parapet, slab and span, not a thicker-is-better rule.
  • Check the base first: a sound parapet and slab decide what can be fixed at all.
  • Split the work honestly: stripping old panes is a weekend job, while fixing, levelling and sealing belong to a crew.
  • Lock the paperwork: approval in a panel building, timing and warranty belong in the contract before ordering.

Request · reply in 10 minutes

Get a Free Balcony Measurement

A surveyor will come on a day that suits you and measure the opening and the parapet. Measurement and delivery are 0 ₸, and we take requests daily from 9:00 to 19:00.

  • 0 ₸measurement and delivery
  • −20%for standard SMART windows
  • 0%Kaspi installment plan in 3 payments

Daily 9:00–19:00 · we reply within 10 minutes during working hours

Installers place the glazing frame on the parapet

«We answer questions before and after installation — call or message us on WhatsApp»

OKNA PLASTInstallation team

+7 777 940 52 40

Questions · 7 answers

Frequently Asked Questions About Balcony Glazing

Glazed loggia with flowers

Didn’t find an answer? Message us on WhatsApp — we reply within 10 minutes.

Ask a question
01Can I glaze a balcony?

Yes, almost any balcony or loggia can be glazed — restrictions are usually related to the condition of the parapet and the type of building. During the free measurement, the engineer will inspect the opening and tell you which option can actually be installed.

02What does balcony insulation include?

Typically, it includes cladding the parapet and walls with insulation, sealing gaps and joints, and installing warm glazing. Sometimes underfloor heating is added, but the exact scope depends on the balcony's construction.

03How is balcony glazing calculated?

The calculation is done after measurement: the engineer measures the opening, checks the geometry and parapet, and clarifies the type of glazing and finishing. The estimate is based on this data, and the price is fixed in the contract.

04How many days does a turnkey balcony take?

From signing the contract to installation takes no more than two weeks, and the installation itself takes one day. On the same day, windows, windowsill, drip cap, and slopes are installed, so nothing needs to be finished later.

05Can a balcony be combined with a room after glazing?

Glazing alone does not give the right to remove the wall and door block — combining requires approval and a project. Warm glazing makes the balcony usable all year round, but it does not eliminate the need for the load-bearing wall.

06Can a double-chamber glass unit be installed in a narrow balcony profile?

In narrow series, a double-chamber glass unit may not fit in thickness, depending on the installation width of the profile. The engineer will check the profile and glass unit during measurement to ensure the structure remains strong.

07What happens if a balcony is glazed without ventilation?

Without air supply, humidity increases on a warm balcony, and condensation may appear on walls and slopes, eventually leading to mold. Therefore, ventilation is planned before installation, not after.

Blog · 8 articles

Helpful reads on glazing and balcony care

All articles
01 / 08
White PVC window and radiator in late autumn in an Almaty apartmentDraughts from windows what to doA practical guide to tracing cold air at the sash, frame and sill, with clear steps you can take yourself and signs that it is time to call a specialist. · 10 min A technician adjusts a plastic window in an apartment in AlmatyWindow adjustment for winterHow winter and summer modes work on PVC window hardware, how to switch the sash yourself, and when it is better to call a technician. · 10 min Dining room in an Almaty house with a new soundproof double-glazed unitSoundproofing plastic windowsWhy street noise gets through your windows and which glazing, profile and seals actually make a room quieter. Practical checks before you order. · 10 min White uPVC window in the living room of an apartment in AlmatyHow to choose window profileChambers, width, reinforcement and series compared: what actually affects warmth, quiet and durability, and what to check before you sign. · 10 min White plastic window with an inward-opening sash and visible hardware in an Almaty living roomPlastic window careA practical guide to washing frames, cleaning double glazing, lubricating hardware and keeping seals soft through Almaty's dusty summers and cold winters. · 10 min Bedroom in Almaty with stained glass glazingWindows for a private houseHow house windows differ from apartment ones, which glazing suits a cottage, and what to check before signing a contract. · 11 min White uPVC window in the bedroom of an apartment in AlmatyHow to choose double glazingA practical guide to double glazing types, chamber count, glass options and what matters beyond the price tag when buying for an apartment in Almaty. · 10 minCraftsmen replace a glass unit in an apartment window in AlmatyWhen to replace double glazingThis guide explains how to tell a failed sealed unit from a window that only needs adjustment, and how to choose the right replacement glass unit for your home. · 10 min